A BETTER BRIEF
Planning your kitchen remodeling project
Define cosmetic versus structural
Replacing cabinets and counters in existing openings is different from moving plumbing, adding an island or changing the layout. List which walls, floors and ceilings are affected.
Sequence the trades
Ask for the order of work: demolition, rough-in (plumbing, electrical, HVAC), drywall, cabinets, counters, backsplash, flooring, trim and painting. Who coordinates and when inspections happen matters.
Compare itemized scopes
Request a line-by-line breakdown. A single kitchen total hides whether disposal, permits, or fixture installation are included.
Jobs to describe in your request
- Cabinet and counter replacement
- Full kitchen gut renovation
- Kitchen layout change
- Island addition
- Backsplash and lighting upgrade
What changes the cost?
Use these factors to compare the scope of proposals. A total price alone does not show whether the same work is included.
- Scope: cosmetic versus layout change
- Cabinetry and counter materials
- Plumbing and electrical changes
- Permit requirements
- Timeline and phasing
Ask for a written description of included work, exclusions, payment stages and how additional work is authorized. Confirm who supplies materials and what documentation or warranty terms you receive at completion.
Official resources
Check these sources and confirm requirements for your property with the responsible authority. Guidance is a starting point, not a property-specific assessment.